亚洲精品国产制服丝袜美腿,ww在线观视频免费观看w,99re99在线精品视频,欧美日韩一区免费精品

<style id="dz4xv"><abbr id="dz4xv"><thead id="dz4xv"></thead></abbr></style>
<legend id="dz4xv"><u id="dz4xv"></u></legend>
<big id="dz4xv"><nobr id="dz4xv"></nobr></big>
    <output id="dz4xv"><strike id="dz4xv"><bdo id="dz4xv"></bdo></strike></output>
  • <sup id="dz4xv"></sup>

        <sub id="dz4xv"><dl id="dz4xv"></dl></sub>

          LJ External wall anti-alkali transparent primer

          PRODUCTS > LJ Coatings series > LJ External wall anti-alkali transparent primer

          LJ External wall anti-alkali transparent primer

          Feature
          Permeability and closure performance;
          Effectively prevent the precipitation of water soluble substance
          Improve the adhesive property and decorative durability of finishing coat;
          Save part of finishing paint
          Improve gloss and other properties

          Introduce

          The base material of the base material of imported special resin acrylic emulsion is adopted as the base material of the external wall anti-alkali closed permeability primer, which has super strong permeability, can reduce the water absorption of the base layer, and provides excellent adhesive force for all kinds of external wall base surface, it can save the consumption of finish paint, improve the glossiness of light paint, reduce the total cost of painting, and make the painting effect of wall surface better.

          Area Applicable.

          Building cement mortar, masonry structure, asbestos board, gypsum board and wood surface.

          Technical parameters

          Color: white translucent.

          Composition: acrylic polymer.

          Gloss: matte.

          Drying Time: surface drying: 2 hours.

          Re-coating time: at least 2 hours (25, 50% relative humidity ).

          Dry paint film thickness: 25 micrometers/layer.

          Theoretical paint consumption: 10 m2/L/floor, the actual construction area will vary depending on construction method, surface roughness and construction environment.

          Storage: Store in a cool and dry place above 0.

          Maintenance period: more than 5 days, the low temperature will be extended accordingly.

          Construction

          Construction method: brushing, roller coating, batch scraping and spraying.

          Dilution: dilute with water below 20%.

          Construction Environment: temperature not lower than 5, relative humidity not higher than 85%.

          Packing

          18KG/barrel